FPSO Helang is now on Charter. The FPSO is permanently moored using LMCs Internal Turret Mooring System. It has been a pleasure working with Yinson on this project and we wish those involved in the FPSO all the success in the future.
OLT has reached its 100th loading operation to the Toscana FSRU Terminal. The FSRU is permanently moored offshore Livorno, Italy, using LMC’s external column turret mooring technology. The turret allows the FSRU to remain on station and weathervane in a 100year return period environment, whilst facilitating the discharge of gas to shore via risers connected…
LMC have successfully completed the fabrication and delivery of the Tether Bases, Riser, and Fibre Optic Cable (FOC) Clamps to our client, Alam-Cortez, today. The two tether bases shall be installed in the Berantai Field, offshore Malaysia and shall be used for anchoring the restraining tethers (also LMC design and supply) for the riser and…
LMC's contractor PJOE successfully loading out the remaining structures for the Helang FPSO Internal turret. These modules have now arrived successfully in Cosco's yard in Qidong ready for integration with the FPSO being converted by our client, Yinson.
The Shaft and Moonpool Integration Structure for the Turret Mooring System that will soon be integrated with Yinson's FPSO Helang ready for sailaway. Fabricated in PJOE in Penglai and delivered ahead of schedule