LMC have successfully completed the fabrication and delivery of the Tether Bases, Riser, and Fibre Optic Cable (FOC) Clamps to our client, Alam-Cortez, today. The two tether bases shall be installed in the Berantai Field, offshore Malaysia and shall be used for anchoring the restraining tethers (also LMC design and supply) for the riser and FOC that shall be connected to the Berantai FPSO. LMC had designed the mooring system for the FPSO in 2011-2012 for the then-operators, Petrofac who have since passed on the field operations to Vestigo Petroleum.
Well done to the design team (LMC London), our site team (LMC APAC), Integer Engineering, Subsea Energy Solutions, AMOS and GT Lifting, for a successful project delivery!